01.030.0804: Brick veneer, CMU backup, rigid insul. w/ taped joints, veneer ties This wall system shows brick veneer, concrete masonry backup, rigid insulation with integral facer and taped joints, and veneer ties tying the brick back to the block. The taped joints in the insulation serve as the wall's air barrier, per insulation manufacturer's recommendations. [...]
01.030.0703: Shelf Angle Detail - Typ. Face Brick, Term Bar This shelf angle detail uses a typical brick course below the shelf angle. This may result in a wider horizontal expansion joint below the angle, but is more economical than using a lipped (notched) brick. The shelf angle is flashed with flexible thru-wall flashing, transitioning [...]
01.030.0804: Brick veneer, CMU backup, rigid insul. w/ taped joints, veneer ties This wall system shows brick veneer, concrete masonry backup, rigid insulation with integral facer and taped joints, and veneer ties tying the brick back to the block. The taped joints in the insulation serve as the wall's air barrier, per insulation manufacturer's recommendations. [...]
03.070.0202: Wall System - Adhered Stone Veneer Over CMU Backup, Sheathing & Z Channels This wall system shows adhered stone veneer over concrete masonry backup with sheathing and Z-channels or Z-girts. Rigid insulation resides between the Z-channels. Cement board sheathing is mechanically fastened to the Z-channels, and the thin stone veneer is bonded to the [...]
03.070.0201: Wall System - Adhered Stone Veneer Over CMU Backup, Cont. Insulation This wall system shows adhered stone veneer over concrete masonry backup with continuous insulation. The thin stone veneer is bonded to the metal lath with a base coat and bond coat of mortar. The lath is anchored to the backup with mechanical fasteners [...]
01.030.0203: Wall System - Brick Veneer, CMU Backup, Rigid Insulation w/ Taped Joints, Veneer Ties This wall system shows brick veneer, concrete masonry backup, rigid insulation with integral facer and taped joints, and veneer ties tying the brick back to the block. The taped joints in the insulation serve as the wall's air barrier, per [...]
02.010.1303: Control Joint - Fire-Rated This detail shows block with flat ends being used at the vertical control joint. Fireproof material resides at the vertical CJ, along with sealant and backer rod. This detail allows shrinkage of the block, but does not resist lateral loads. There is horizontal joint reinforcement at 16" o.c. vertically in [...]
02.410.0132: High Lift Grouting Procedures This detail shows a concrete masonry (CMU) wall grouted using high lift grouting procedures. Vertical reinforcement is shown with optional rebar positioners, and vertical bars overlap to achieve sufficient development strength per structural design. Grout is applied vertically in lifts between 5'-0" and 12'-8", therefore cleanout openings may be required [...]
This site uses cookies
Small text files that are placed on your machine to help the site provide a better user experience. In general, cookies are used to retain user preferences, store information for things like shopping carts, and provide anonymised tracking data to third party applications like Google Analytics. As a rule, cookies will make your browsing experience better. However, you may prefer to disable cookies on this site and on others. The most effective way to do this is to disable cookies in your browser. We suggest consulting the Help section of your browser or if you decline you will be redirected to the About Cookies website which offers guidance for all modern browsers.