02.410.0132: High Lift Grouting Procedures

02.410.0132: High Lift Grouting Procedures This detail shows a concrete masonry (CMU) wall grouted using high lift grouting procedures. Vertical reinforcement is shown with optional rebar positioners, and vertical bars overlap to achieve sufficient development strength per structural design. Grout is applied vertically in lifts between 5'-0" and 12'-8", therefore cleanout openings may be required [...]

02.410.0131: Low Lift Grouting Procedures

02.410.0131: Low Lift Grouting Procedures This detail shows a concrete masonry (CMU) wall grouted using low lift grouting procedures. Vertical reinforcement is shown with optional rebar positioners, and vertical bars overlap to achieve sufficient development strength per structural design. Grout is applied vertically in lifts not to exceed 5 feet, therefore cleanout openings may not [...]

02.010.0801: Masonry Wall Cap – Single Wythe CMU

02.010.0801: Masonry Wall Cap - Single Wythe CMU This detail shows a concrete masonry (CMU) wall, top of wall detail. The wall cap is anchored to the grouted wall with a vertical dowel through the flashing, which is then sealed around the dowel penetration. The flashing is shown as a flexible material for the through-wall [...]